PROJECTS
  1. BOGOSU GOLD PLANT
    Supply, fabricate and erect Leach and CIL tanks, Reagent tanks, Fuel Storage tanks and Process Thickeners.

  2. SANSU GOLD PLANT
    Supply, fabricate and erect Leach and CIL tanks, Fuel and Process tanks.

  3. IDUAPRIEM GOLD PLANT
    Supply, fabricate and erect Leach and Adsorption tanks and Raw water tank.

  4. IDUAPRIEM OVERLAND PIPELINE
    Supply fabricate and erect Tailings Discharge Line (3000m ), Raw Water Supply Line (10,600m), Tailings Water Recovery Line (350m) and Raw Water Dam Recovery Line (750m)

  5. BOGOSU CONVEYOR REPAIR
    Undertake repairs and modifications to over‑road conveyor at Bogosu Treatment Plant.

  6. SANSU SULPHIDE TREATMENT PLANT
    Supply, fabricate and erect mild steel Process tanks, 28No total.

  7. SANSU SULPHIDE TREATMENT PLANT
    Supply, fabricate and erect 304L stainless steel Process Tanks, 26No total.

  8. KONONGO GOLD PLANT
    Dismantle, upgrade and refurbish old Craggiemore Plant and erect at Ghana Site.

  9. KONONGO GOLD PLANT
    Supply, fabricate and erect including civil works, CIL tankage.

  10. OBOTAN GOLD PLANT
    Supply, fabricate and erect CIL tanks and process water tank.

  11. DAMANG GOLD PLANT
    Supply, fabricate and erect CIL tanks and Process tanks.

  12. BIBIANI GOLD PLANT
    Supply, fabricate and erect CIL Tankage.

  13. DAMANG GOLD PLANT
    Supply, fabricate and install complete plant pipe work.

  14. MOBIL OIL FUEL FARM
    Design, supply, fabricate and erect 8 Million lt Diesel fuel tank, dismantle for erection at a later date a 2 Million lt tank, at Teberebie Gold Mine.

  15. BIBIANI GOLD PLANT
    Supply, fabricate and erect 6th, CIL tank inc. top of tank steel and tie‑in to existing piping.

  16. SANSU SULPHIDE TREATMENT PLANT
    Erect new 304L stainless steel BIOX Reactor tank.

  17. MOBIL OIL FUEL FARM
    Design, supply, fabricate and re‑erect 2No one Million ltr fuel tanks at the Satellite Gold Mine, constructed from a 2 Million ltr tank dismantled at Teberebie.

  18. BIBIANI GOLD PLANT
    On site erection of new stockpile conveyor, ROM bin and associated steel work including a 48hr shutdown to tie in and modify with existing chutes.

  19. DAMANG GOLD PLANT
    Part supply, erection, commissioning of all structural steel, mechanical and piping for the pebble crushing circuit. Also includes a shutdown period to tie into existing facilities.

  20. TARKWA PHASE IV - GOLD PLANT EXPANSION
    Detail, supply, fabricate and erection of all site erected tankage.

  21. AHAFO - GOLD PLANT
    Stage 1- Installation of the project infrastructure piping.
    Stage 2- Detail, supply, fabricate and erection of all site erected tanks.
    Stage 3- CCD 38m dia. thickener construction complete with sundry tanks.

  22. MRP PROJECT – TEMA POWER GENERATION PLANT
    All onsite fuel and water tanks and all piping for fuel, air and site services.

  23. AKYEM GOLD MINE PROJECT – GOLD PLANT
    Detail, supply, fabrication and erection of 11No 15.8m dia. CIL tanks, 16No sundry tanks, 3no 42m dia. thickeners. Design and construction of Shell fuel facility covering 2No 12.5m dia. tanks, 2No horizontal tanks and all associated pipework and associated equipment installation.

  24. FLUOR INTERNATIONAL – LOGCAP IV in West Africa
    Provide ongoing Labour Hire for LOGCAP IV in West Africa.

  25. BISSA – NORDGOLD
    Ongoing basis responsible for plant maintenance services.

  26. RAIL & PORT OPERATIONS – AFRICA MINERALS LIMITED
    Contracted in 2011 to provide Labour Hire on an ongoing basis for construction and operations of the Tonkolili Iron Ore, Railway & Ports operations and upgrade. This included provision of over seventy (70) tradesmen for a period of 24months to complete phases 1A & B of the project. Plant Maintenance division has also been involved with the Ports Operations of periodically for shutdown maintenance.

  27. LMC MARAMPA – LONDON MINING
    From 2011 to 2013 provided labour hire for the construction of the LMC Marampa Iron Ore mine. We staffed and managed over 80 tradesmen and engineers for a period 18months to complete phases 1A & B of the Marampa Iron Ore mine

  28. EDIKAN GOLD PLANT MODIFICATION – PERSEUS MINING
    Supply, fabrication, installation of Structural, Mechanical and Piping works to interface with operating equipment required to conform to all lock out procedures.